End of Long Lake Winter Drawdown 2024
LONG LAKE SPRING 2024
END OF 23/24 DRAWDOWN
DATE: March 14, 2024
Ice is now out on Long Lake and water levels are being returned to normal pool elevation. During the refill process, flow needs to be maintained in the Brill River downstream of the dam. Due to lack of snow, the refill process is expected to take longer.
BRIAN DANIELSEN, P.E. WASHBURN COUNTY HIGHWAY COMMISSIONER